Baesa-energetica Barra Grande, FRN 15jul2033, BRL (002/001) (FIGI BBG023P9SQJ6, BESA12, BRBESADBS025)
使用 Cbonds Watchlist 查找、保存和跟踪投资工具
有了 Cbonds Watchlist,您可以随时了解投资信息,做出明智决策!
国内债券, 浮动利率, Senior Unsecured
有了 Cbonds Watchlist,您可以随时了解投资信息,做出明智决策!
国内债券, 浮动利率, Senior Unsecured
|
Baesa-energetica Barra Grande S.A. was incorporated on 17 September, 2001. The company operates in the electric power sector and is responsible for the Barra Grande Hydroelectric Plant. The company is a concessionaire for the exploitation of ...
Baesa-energetica Barra Grande S.A. was incorporated on 17 September, 2001. The company operates in the electric power sector and is responsible for the Barra Grande Hydroelectric Plant. The company is a concessionaire for the exploitation of the Barra Grande hydroelectric use.
|
| Floating rate |
| Brazil Interbank Deposit Rate (DI) |
|
|
|
|
|
|
探索最全面的数据库
1 000 000
债券
100 000
股票
175 910
ETF & Funds
8万
指数
以最有效的方式跟踪您的投资组合